Laser clad fuel injector premix barrel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9989259
SERIAL NO

14879182

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel injector for a gas turbine engine may include a center body disposed about a longitudinal axis, and a premix barrel positioned radially outwardly from the center body to define an annular passageway between the center body and the premix barrel. The annular passageway may extend from an upstream end that is configured to be fluidly coupled to a compressor to a downstream end that is configured to be fluidly coupled to a combustor. The premix barrel may include a first portion at the upstream end and a second portion at the downstream end. The first portion may include a stainless steel material, and the second portion may include a nickel based superalloy material. The second portion may be coupled to the first portion by a laser clad coupling.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOLAR TURBINES INCORPORATEDSAN DIEGO CA 92101

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barker, Peter Escindido, US 59 1148
Corr,, II Robert Anthony San Diego, US 4 19
Krichever, Alexander Ilich Carlsbad, US 3 10
Montague, John Preston San Marcos, US 2 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00