Premixed-combustion gas turbine combustor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9989258
APP PUB NO 20150300648A1
SERIAL NO

14438723

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gas turbine combustor forms a combustion region R1 therein by burning a premixed gas obtained by previously mixing a fuel and combustion air. The gas turbine combustor includes: a burner cylinder (51) in which the premixed gas passes; a film air supply port (61) that is provided on the burner cylinder 51, and supplies a film air formed into a film shape and flowing along the inner wall surface (the inner circumferential surface) of the burner cylinder (51); and a cooling passage (71) in which a cooling air passes. The cooling air cools a back-step surface (65) facing the formed combustion region R1. The cooling passage (71) includes a side from which the cooling air flows out, and the side is connected to the film air supply port (61).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI POWER LTD2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 1008332 ?1008332

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akamatsu, Shinji Tokyo, JP 52 355
Saito, Keijiro Tokyo, JP 41 223
Saito, Toshihiko Tokyo, JP 172 2927
Takiguchi, Satoshi Tokyo, JP 43 193

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00