Liner assembly and method of turbulator fabrication
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jun 5, 2018
Issued Date -
N/A
app pub date -
Jul 25, 2014
filing date -
Jul 25, 2014
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
A method of turbulator fabrication is provided and includes additively disposing an elongate flexible member in tension onto a liner body, dispensing braze paste at an elongate flexible member-liner body interface and conducting a brazing process with respect to the braze paste to attach the elongate flexible member to the liner body.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
GE INFRASTRUCTURE TECHNOLOGY LLC | 300 GARLINGTON ROAD GREENVILLE SC 29615 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Cui, Yan | Greer, US | 229 | 1510 |
# of filed Patents : 229 Total Citations : 1510 | |||
Kottilingam, Srikanth Chandrudu | Simpsonville, US | 217 | 1526 |
# of filed Patents : 217 Total Citations : 1526 | |||
Lin, Dechao | Greer, US | 93 | 467 |
# of filed Patents : 93 Total Citations : 467 | |||
Tollison, Brian Lee | Honea Path, US | 102 | 439 |
# of filed Patents : 102 Total Citations : 439 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- B23K Class
- 0 % this patent is cited more than
- 7 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Dec 5, 2025 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Dec 5, 2029 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Matter Detail

Renewals Detail
