High efficiency production of nanofibrillated cellulose

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9988762
SERIAL NO

15309117

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A scalable, energy efficient process for preparing cellulose nanofibers employs treating the cellulosic material with a first mechanical refiner with plates having a configuration of blades separated by grooves, and subsequently treating the material with a second mechanical refiner with plates having a configuration of blades separated by grooves different than the first refiner. The plate configurations and treatment operations are selected such that the first refiner produces a first specific edge loading (SEL) that is greater than the SEL of the second refiner, by as much as 2-50 fold. An exemplary high first SEL may be in the range of 1.5 to 8 J/m. Paper products made with about 2% to about 30% cellulose nanofibers having a length from about 0.2 mm to about 0.5 mm, preferably from 0.2 mm to about 0.4 mm have improved properties.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIVERSITY OF MAINE SYSTEM BOARD OF TRUSTEES15 ESTABROOKE DRIVE OFFICE 251 ORONO ME 04469

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bilodeau, Michael A Brewer, US 23 211
Paradis, Mark A Old Town, US 13 156

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00