Method for producing polycarbonate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9988490
SERIAL NO

15314406

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a method of producing a polycarbonate that enables efficient drying of a polycarbonate powder and has no risk of deteriorating the quality of a polycarbonate molded article to be obtained. The method of producing a polycarbonate includes: a step of causing an alkali aqueous solution of a dihydric phenol and phosgene to react with each other in the presence of an organic solvent to produce an organic solvent solution containing a polycarbonate; a powdering step of powdering the organic solvent solution containing the polycarbonate to provide a polycarbonate powder; and a pre-drying step of drying the polycarbonate powder to remove the remaining organic solvent, in which a drying temperature in the pre-drying step is set to a temperature lower than the glass transition temperature of the polycarbonate containing 1.5 mass % of the organic solvent by from 5° C. to 15° C.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IDEMITSU KOSAN CO LTDTOKYO TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mabuchi, Kota Narashino, JP 1 2
Nagao, Yukiko Tokyo, JP 14 53
Takahashi, Masayuki Taipei, TW 242 2846

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00