Method of fabricating integrated structure for MEMS device and semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9988264
SERIAL NO

14489495

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of fabricating an integrated structure for MEMS device and semiconductor device comprises steps of: providing a substrate having a transistor thereon in a semiconductor device region and a first MEMS component thereon in a MEMS region; performing a interconnect process on the substrate in the semiconductor device region to form a plurality of first dielectric layers, at least a conductive plug and at least a conductive layer in the first dielectric layers; forming a plurality of second dielectric layers and an etch stopping device in the second dielectric layers on the substrate in a etch stopping device region; forming a plurality of third dielectric layers and at least a second MEMS component in the third dielectric layers on the substrate in the MEMS region; and performing an etching process to remove the third dielectric layers in the MEMS region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MARLIN SEMICONDUCTOR LIMITEDBRACKEN ROAD SANDYFORD FIRST FLOOR BLACKTHORN EXCHANGE DUBLIN D18 P3Y9

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Min New Taipei, TW 288 3072
Ho, Li-Hsun Hsinchu County, TW 8 78
Huang, Chien-Hsin Taichung, TW 44 877
Lan, Bang-Chiang Taipei, TW 31 485
Su, Tzung-I Yun-Lin County, TW 38 317
Wu, Hui-Min Hsinchu County, TW 27 410
Wu, Wei-Cheng Hsinchu County, TW 245 5535

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00