Micromechanical device and method for manufacturing a micromechanical device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9988261
APP PUB NO 20130334622A1
SERIAL NO

13917044

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A micromechanical device, in particular a sensor device, and a method for manufacturing a micromechanical device are provided. The micromechanical device has a housing, the housing including a first cavity, and the housing including a second cavity that is separate from the first cavity. The micromechanical device is configured in such a way that a predetermined first gas pressure prevails in the first cavity, and a predetermined second gas pressure which is reduced compared to the first gas pressure prevails in the second cavity. A heating element is situated in the area of the second cavity. The micromechanical device has a printed conductor, the heating element being heatable with the aid of the printed conductor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROBERT BOSCH GMBHPOSTFACH 30 02 20 70442 STUTTGART 70442

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gonska, Julian Reutlingen, DE 18 279
Gutsche, Kathrin Oberhausen, DE 2 5
Reinmuth, Jochen Reutlingen, DE 150 702

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00