Manufacture of well tools with matrix materials

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9987675
SERIAL NO

14378992

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a well tool can include loading a matrix material into a mold, then sintering the matrix material in the mold; and then loading another matrix material into the mold. A well tool can include a longitudinal axis, an erosion resistant layer exposed to one or more erosive factors when the well tool is installed in a well, and a support layer which supports the erosion resistant layer. The erosion resistant and support layers can include respective matrix materials, and the erosion resistant layer can extend greater than approximately 1.27 cm in a direction parallel to the longitudinal axis. Another method of manufacturing a well tool can include forming a rigid layer from a powdered matrix material; and then infiltrating both that matrix material and another matrix material with a hot liquid binder material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HALLIBURTON ENERGY SERVICES INC3000 N SAM HOUSTON PARKWAY E HOUSTON TX 77032-3219

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Thomas, Jeffrey G Magnolia, US 58 352

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00