Crosslinked hydrogels and related method of preparation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9987225
APP PUB NO 20120321585A1
SERIAL NO

13499088

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a method of manufacturing a hydrogel comprising the step of crosslinking a biopolymer using a carbodiimide crosslinker of Formula I wherein at least one of R1 and R2 is a functional group that is a bulky organic functional group. R1 and R2 can each independently be an optionally substituted saturated or unsaturated functional group selected from the group consisting of an alkyl, a cycloalkyl, a heterocyclic, and an aryl. The bulky organic functional group will slow down the crosslinking reaction of carbodiimide due to the steric effects and/or electronic effects, in comparison to a crosslinking reaction using EDC. Also provided are the hydrogels and ophthalmic devices prepared using the method of the invention and uses thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIVERSITY OF OTTAWA3042-800 KING EDWARD AVE SUITE 400 OTTAWA K1N 6N5
OTTAWA HOSPITAL RESEARCH INSTITUTEOTTAWA ON K1N 6N5

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahn, Jae-Il Ottawa, CA 1 5
Griffith, May Carp, CA 14 404
Li, Fengfu Gloucester, CA 10 345

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00