Negative supply rail positive boost write-assist circuits for memory bit cells employing a P-type field-effect transistor (PFET) write port(s), and related systems and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9984730
SERIAL NO

14862636

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Write-assist circuits for memory bit cells (“bit cells”) employing a P-type Field-Effect transistor (PFET) write port(s) are disclosed. Related methods and systems are also disclosed. It has been observed that as node technology is scaled down in size, PFET drive current (i.e., drive strength) exceeds N-type Field-Effect transistor (NFET) drive current for like-dimensioned FETs. In this regard, in one aspect, it is desired to provide bit cells having PFET write ports, as opposed to NFET write ports, to reduce memory write times to the bit cells, and thus improve memory performance. To mitigate a write contention that could otherwise occur when writing data to bit cells, a write-assist circuit provided in the form of a negative supply rail positive boost circuit can be employed to weaken an NFET pull-down transistor in a storage circuit of a memory bit cells having a PFET write port(s).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
QUALCOMM INCORPORATED5775 MOREHOUSE DRIVE SAN DIEGO CA 92121-1714

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Atallah, Francois Ibrahim Raleigh, US 42 321
Bowman, Keith Alan Morrisville, US 34 228
Hansquine, David Joseph Winston Raleigh, US 13 92
Jeong, Jihoon Cary, US 49 216
Nguyen, Hoan Huu Durham, US 17 104

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00