Inflow performance relationship for multilateral wells

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9984180
APP PUB NO 20160328497A1
SERIAL NO

14704507

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Described herein is an empirical model to estimate inflow performance relationship (IPR) of fishbone wells. A reservoir simulation model is formulated and initial values for a plurality of reservoir and fishbone well parameters are assigned. IPR curves are generated by simulating the formulated reservoir model for a predetermined number of iterations. Each simulation iteration has a unique value of bottom-hole flowing pressure. Sensitivity analysis is performed based on the generated IPR curves by sequentially changing the values of the plurality of fishbone well parameters. Further, regression analysis is performed based on the sensitivity analysis in order to determine an empirical model that estimates the IPR of the fishbone well. The empirical model is determined as a function of a number of multilateral branches of the fishbone well.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KING FAHD UNIVERSITY OF PETROLEUM AND MINERALSDHAHRAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alnuaim, Sami Abdulaziz Dhahran, SA 16 48
Hamza, Ahmed Abdulazeem Dhahran, SA 2 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00