Method of manufacturing a structure on a substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9983480
SERIAL NO

15270422

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method includes dividing a single beam emitted from a coherent light source into at least two branch beams, and causing the branch beams to cross each other at a predetermined interference angle thereby generating interference pattern. The method also includes irradiating a target surface of a substrate with the interference pattern. The method also includes dividing the target surface of the substrate into a plurality of predetermined shapes, and repeating a first substep of irradiating each predetermined shape with every shot of the interference pattern, and a second substep of conveying the substrate in a stepwise manner such that the predetermined shapes overlap each other in the stepwise manner. The method also includes causing a line-to-line pitch of the interference fringes in one of the predetermined shapes to align with the line-to-line pitch of the interference fringes in a next predetermined shape upon repeating the first and second substeps.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
USHIO DENKI KABUSHIKI KAISHA1-6-5 MARUNOUCHI CHIYODA-KU TOKYO 1008150 ?1008150

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yajima, Daisuke Tokyo, JP 5 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00