High-data-rate electrical interconnect cables

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9983376
SERIAL NO

15131252

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

High-data-rate interconnect cables are disclosed, wherein electrical data signals are transmitted in a conductor assembly made of a thin metal layer surrounding a cylindrical support member. The cylindrical support member can be a high-resistivity conductor or a dielectric, such as a glass optical waveguide that supports the transmission of optical signals. The cylindrical support member can also be a core conductor that supports the transmission of electrical power and low-frequency auxiliary signals. The high-data-rate interconnect cables are self-equalizing, so that a data link transmission system that employs the high-data-rate interconnect cable does not require active equalization.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CORNING OPTICAL COMMUNICAITONS LLC800 17TH STREET NW HICKORY NC 28601

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Charbonneau-Lefort, Mathieu San Jose, US 17 335
Khrapko, Rostislav Radiyevich Corning, US 19 42
Trutna, William Richard Atherton, US 13 271
Walker, Richard Clayton Palo Alto, US 9 241

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00