Method and a control unit for validating an electric power plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9983241
SERIAL NO

14492359

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for validating an electric power plant capability as an electric service provider is provided. The method includes receiving a plurality of input data records from the plurality of renewable energy devices, respectively, the input data records respectively defining a plurality of device capabilities associated with at least one electrical service which can be provided by the renewable energy devices to the electric distribution grid; estimating internal power losses of the electric power plant; using the input data records and the internal power losses for calculating an output data record defining an overall plant capability for the service; communicating the output data record to an operator of the electric distribution grid; and receiving a validation signal from the operator of the electric distribution grid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS GAMESA RENEWABLE ENERGY A/SBORUPVEJ 16 BRANDE 7330

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nielsen, Kaj Skov Issaquah, US 25 252

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00