Solid borne sound wave phase delay comparison

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9983073
SERIAL NO

14901972

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mechanical force measurement system is for measuring a force onto an object. The measurement system includes a sound wave generator which is adapted to generate a solid borne sound wave signal within the object. The system further includes a first sound wave receiver which receives a first solid borne sound wave signal based on the solid borne sound wave signal generated within the object by the sound wave generator. In order to compare a phase of the generated solid borne sound wave signal and a phase of the first received solid borne sound wave signal, and to generate a comparison signal based thereon. The system also includes a comparator unit. An evaluation unit of the system determines the mechanical force based on a data base and the comparison signal. The data base has stored a relation of a mechanical force and a comparison.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TORQUE AND MORE (TAM) GMBH82319 STARNBERG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
May, Lutz Berg, DE 59 547

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00