Determining a load meter installation location in an energy generation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9983024
SERIAL NO

14743727

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Certain embodiments include receiving load data from an energy generation (EG) system, where the load data is provided by a load meter, and where the load data corresponds to a predetermined time period. The predetermined time period may be during peak daylight hours (e.g., between 10 A.M. and 2 P.M). The method includes receiving EG data from the EG system, where the EG data corresponds to EG generation by an EG circuit over the predetermined time period, and determining if an inverse relationship exists between the load data and EG data. The method includes determining that the load meter is installed upstream from the EG circuit if an inverse relationship between the load data and EG data exists, and determining that the load mater is installed downstream from the EG circuit if an inverse relationship between the load data and EG data does not exist.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TESLA INC1 TESLA ROAD AUSTIN TX 78725

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Beals, Trenton John Hayward, US 8 22
Carlson, Eric Daniel San Mateo, US 26 324
Theurer, Jean Elizabeth San Francisco, US 3 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00