HVAC system with predictive free cooling control based on the cost of transitioning into a free cooling state

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9982903
SERIAL NO

15411878

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A heating, ventilation, or air conditioning (HVAC) system for a building includes, a chiller, a heat exchanger separate from the chiller, and a controller. The chiller is configured to provide mechanical cooling for a cooling load in the building when the HVAC system operates in a mechanical cooling state. The heat exchanger is configured to provide free cooling for the cooling load in the building when the HVAC system operates in a free cooling state. The controller is configured to predict outside air temperature and transition the HVAC system from operating in the mechanical cooling state to operating in the free cooling state in response to a determination that the predicted outside air temperature will be less than the free cooling temperature threshold for at least the minimum free cooling time.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TYCO FIRE & SECURITY GMBHVICTOR VON BRUNS-STRASSE 21 8212 NEUHAUSEN AM RHEINFALL SWITZERLAND

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asmus, Matthew J Watertown, US 46 1134
Ridder, Bradley J Milwaukee, US 4 107
Willmott, Graeme West Milwaukee, US 28 312

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00