Manufacturing method of carbon-silicon composite

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9981993
SERIAL NO

14793742

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein are a manufacturing method of a carbon-silicon composite, including: (a) preparing a slurry solution including silicon (Si)-block copolymer core-shell particles; (b) mixing the slurry solution with a carbon raw material to manufacture a mixed solution; (c) performing a primary carbonization process on the mixed solution, followed by pulverization, to manufacture a primary carbon-silicon composite; and (d) performing a secondary carbonization process on the primary carbon-silicon composite, followed by pulverization, to manufacture a secondary carbon-silicon composite, the carbon-silicon composite, an anode for a secondary battery manufactured by applying the carbon-silicon composite, and a secondary battery including the anode for a secondary battery.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OCI COMPANY LTD94 SOGONG-RO JUNG-GU SEOUL 04532

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ha, Jeong-Hyun Seongnam-si, KR 9 82
Jeong, Eun-Hye Seongnam-si, KR 12 83
Jung, Sung-Ho Seongnam-si, KR 21 232
Kim, Yo-Seop Seongnam-si, KR 13 84

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00