Dynamic means of illuminating a field of vision

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9981593
SERIAL NO

14904965

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing an adaptive light pattern that is produced by at least one vehicle headlight (SW1, SW2) in a vehicle (2) that can be steered by a vehicle driver (3), the at least one vehicle headlight (SW1, SW2) having at least one adaptive means of illumination (BM1, BM2), wherein at least one camera (5) detects the direction (BR) in which the vehicle driver is looking, at least one computing unit (6) evaluates the information obtained in this way and produces, on the basis of this information, control signals and transmits the control signals to the at least one vehicle headlight (SW1, SW2) with the at least one adaptive means of illumination (BM1, BM2), and wherein the at least one adaptive means of illumination (BM1, BM2) is controlled, on the basis of the control signals for targeted illumination of an area (BR1) lying in the direction (BR) in which the vehicle driver (3) is looking.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZKW GROUP GMBHROTTENHAUSER STRASSE 8 WIESELBURG 3250

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mayer, Peter Wieselburg, AT 117 567

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00