Maintenance tool and method for a split friction bearing assembly and rotary machine using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9981352
SERIAL NO

14390459

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The tool is designed to carried out maintenance operations on a bearing assembly comprising a bushing split into at least two shells; the maintenance tool comprises a device arranged to act on and rotate the bushing shells. In particular, the device comprises a slide and a pin; the slide has a hole transversal to its sliding direction and the pin is slidably mounted inside the hole and protrudes from the hole; in a first operating position the pin acts on a shell and in a second operating position the pin does not act on any shell. The method provides to rotate the bushing shells without rotating the supported shaft, and to carry out maintenance operations on a shell at a time while leaving the shaft supported by the other shell.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NUOVO PIGNONE TECNOLOGIE S R LITALY FLORENCE FIRENZE FLORENCE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bargiacchi, Massimo Florence, IT 5 4
Bogazzi, Michele Florence, IT 1 2
Breschi, Tommaso Florence, IT 3 45
Raugei, Leonardo Florence, IT 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00