Separator with direct drive and coolant system integrated into drive housing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9981275
SERIAL NO

14442064

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A separator includes: a centrifugal drum; a drive spindle, where the drive spindle is rotatably mounted in a drive housing by a neck bearing and a foot bearing, and where the drive housing encloses a drive chamber; an electric motor which has a stator and a motor rotor, where the motor rotor is disposed on the drive spindle, where the stator is fixedly connected to the drive housing, where an air gap exists between the stator and the motor rotor, and where the stator and the motor rotor are arranged between the neck bearing and the foot bearing; a lubricating system for lubrication of the neck bearing and the foot bearing; and a coolant system; where the stator has a flange section which is disposed on a collar section of the drive housing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GEA MECHANICAL EQUIPMENT GMBH59302 OELDE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Droste, Johannes Rosendahl, DE 8 28
Mackel, Juergen Oelde, DE 3 15
Strauch, Dieter Oelde, DE 13 167

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00