Electricity meter isolated physical layer ethernet interface

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9976870
SERIAL NO

14015498

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A metering arrangement includes at least a first and second meter. The first meter includes a first metrology circuit, an Ethernet controller, and an isolation circuit. The first metrology circuit has a first data interface. The Ethernet controller has an Ethernet port and a conversion circuit coupled to convert Ethernet standard signals having a first communication protocol to signals of a second communication protocol. The isolation circuit is coupled between the Ethernet controller and the first data interface. The Ethernet controller is operably coupled to communicate data with the first data interface via the isolation circuit, and the conversion circuit is further operably coupled to communicate data via the first data port. The second meter includes a second metrology circuit having a second data interface operably connected to a second data port. The second data port is operably coupled to communicate data with the first data port.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LANDIS+GYR LLC2800 DUNCAN ROAD LAFAYETTE IN 47904

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ramirez, Anibal Diego Indianapolis, US 26 404

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00