Air nozzle arrangement in a fluidized bed boiler, grate for a fluidized bed boiler, and a fluidized bed boiler

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9976739
SERIAL NO

14442378

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An air nozzle arrangement for a fluidized bed boiler, comprising an air feed pipe and an air nozzle which limit an air feed duct configured to supply air to the furnace of the fluidized bed boiler. The air nozzle arrangement comprises a surface configured to guide coarse material along said surface. At least part of said surface is thermally insulated from the air nozzle and/or the air feed pipe. Furthermore, at least part of said surface is configured to protect at least part of said air nozzle and/or air feed pipe. Thus, the temperature of said surface is configured to be high when the fluidized bed boiler is in operation, whereby the solidification of molten material of the fluidized bed in the air nozzle arrangement is reduced.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VALMET TECHNOLOGIES OYESPOO FINLAND ESPOO SOUTHERN FINLAND

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kainu, Vesa Kangasala, FI 7 23
Leppälä, Jukka-Pekka Tampere, FI 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00