Daylighting device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9976718
SERIAL NO

15310261

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A daylighting device (10) according to an aspect of the present invention includes a first substrate (1) which has optical transparency and to which external light is incident; a second substrate (2) which has optical transparency and is disposed facing the first substrate (1); a light diffusion layer (3) which is disposed between the first substrate (1) and the second substrate (2); and a daylighting layer (4) which is disposed between the first substrate (1) and the second substrate (2) and is formed by including a plurality of daylighting portions (42) having optical transparency and a void portion (43) which is provided between the plurality of daylighting portions (42) in one surface facing the light diffusion layer (3).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHARP KABUSHIKI KAISHA22-22 NAGAIKE-CHO ABENO-KU OSAKA-SHI OSAKA 545-8522

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kamada, Tsuyoshi Sakai, JP 216 2857
Kanno, Toru Sakai, JP 51 460
Nishinaka, Shumpei Sakai, JP 28 123
Shinozaki, Daisuke Sakai, JP 35 128
Ueki, Shun Sakai, JP 104 1682
Ueki, Tomoko Sakai, JP 14 29
Yui, Hideomi Sakai, JP 46 138

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00