Luminaire for crosswalk, method for making, and method for controlling

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9976714
SERIAL NO

15303542

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure describes light delivery and distribution components of a light duct that can be used as a luminaire, such as a bollard-style luminaire that can be useful for the illumination of pedestrian crosswalks, the light engine useful in the luminaire, and methods for making the light engine and the luminaire. The present disclosure further describes methods for crosswalk illumination using the bollard-style luminaires, and methods of communication between bollard luminaires. The bollard luminaire includes a design that generally confines light to illuminate the crosswalk and the pedestrian in the crosswalk, such that light that could produce glare for the pedestrian and/or a driver approaching the crosswalk is minimized.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
3M INNOVATIVE PROPERTIES COMPANYPO BOX 33427 ST PAUL MN 55133-3427

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amell, Nicholas G Burnsville, US 29 373
Freier, David G St. Paul, US 49 850
Geisler, Karl J L St. Paul, US 19 82
Kappel, Glendon D Eagan, US 29 242
Mathews, Mark G Oakdale, US 7 50
Simons, Scott E Scandia, US 6 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00