Method of operating a gas turbine engine burning vanadium-contaminated liquid fuel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9976488
SERIAL NO

14691053

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of operating of a gas turbine engine to inhibit vanadic corrosion of the gas turbine engine is provided. The gas turbine engine burns a vanadium-contaminated fuel and includes a component configured to be in contact with combustion gases. The method includes introducing into a combustion system of the gas turbine engine a first oxide and at least one second oxide. The first oxide includes magnesium oxide, and the at least one second oxide includes at least one of aluminum oxide, iron (III) oxide, titanium dioxide, and silicon dioxide. The method further includes cleaning at least a portion of the component using a cleaning agent containing a liquid vector and at least one descaling material that is suspended in the liquid vector. The at least one descaling material is an inorganic material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Moliere, Michel Marie Raymond Belfort, FR 2 9
Sokolov, Dmitry Buc, FR 7 7
Verdy, Christophe Fabrice Evette-Salbert, FR 1 4
Vierling, Matthieu Paul Frederic Dampierre-les-Bois, FR 6 56

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00