Method for warming an internal combustion engine, and internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9976471
SERIAL NO

14630278

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure relates to a method for expediting warm up of an internal combustion engine cylinder block and engine oil utilizing an existing oil coolant circuit. A method for warming up an internal combustion engine with at least one cylinder, a cylinder block which is formed by an upper crankcase half mounted to a lower crankcase half, said lower crankcase half containing an oil sump which is fed, via a supply line, by a coolant jacket, an inlet side of said coolant jacket supplied in turn with oil via the oil sump by an oil pump, the method comprising: releasing oil from the coolant jacket via gravity to reduce a cooling capacity of the internal combustion engine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORD GLOBAL TECHNOLOGIES LLC1 AMERICAN RD FL4 DEARBORN MI 48126-2701

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lorenz, Thomas Cologne, DE 68 615
Mehring, Jan Cologne, DE 69 409
Springer, Moritz Klaus Hagen, DE 45 503
Steiner, Bernd Bergisch Gladbach, DE 51 533

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00