Excavating implement heading control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9976285
SERIAL NO

15221188

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An excavator includes a chassis, an implement, control architecture, and an assembly to swing with, or relative to, the chassis and including a boom, stick to curl relative to the boom, and coupling between the implement and stick. The implement rotates about an axis R such that a leading edge LE defines a heading Î. The control architecture comprises sensors, actuators, and controllers to utilize sensor signals to generate a LE position relative to a reference based on reference data and map information, utilize sensor implement edge signals and the excavator position relative to the reference and map information to generate a nearest implement edge (NIE) signal indicative of a LE NIE position relative to the reference, and utilize the actuators for divertive implement rotation about R to adjust Î to account for divertive rotation away from an actual or projected overlap of the NIE and reference.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CATERPILLAR TRIMBLE CONTROL TECHNOLOGIES LLC5475 KELLENBURGER ROAD DAYTON OH 45424

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Padilla, Christopher A Chillicothe, US 5 42

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00