Rubber-silica composite and method for producing same, and rubber composition and pneumatic tire

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9976013
SERIAL NO

14905149

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Acido-basic properties of a system containing a polymer fragment obtained by oxidative cleavage of a carbon-carbon double bond of a diene rubber polymer and a functional molecule having in a structure thereof an alkoxysilyl group and at least one functional group selected from the group consisting of an aldehyde group and a carbonyl group are changed such that the system becomes basic when acidic, and becomes acidic when basic, thereby combining the polymer fragment with the functional molecule to form a modified diene rubber polymer having an alkoxysilyl group incorporated therein. A silane monomer comprising tetraalkoxysilane and/or alkyl trialkoxysilane is added to the system containing the modified diene rubber polymer, followed by condensation polymerization, thereby forming silica.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYO TIRE & RUBBER CO LTD17-18 EDOBORI 1-CHOME NISHI-KU OSAKA-SHI OSAKA 550-8661

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kawai, Nobutomo Osaka, JP 4 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00