Method for producing a lamella core

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9975267
SERIAL NO

14468763

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing a semi-product for a building panel, wherein the method includes the step of: arranging at least two distance strips, on a first sawn timber board; arranging a second saw timber board to the distance strips; applying a glue; positioning of the first and the second sawn timber board and the distance strips by applying a pressure; and applying a pressure on the first and the second sawn timber board by a third and a fourth element, in a direction perpendicular to a top surface of the second sawn timber board, until the distance strips is bonded by the glue to the first and the second sawn timber board and thereby obtaining a solid batch; and cutting of said solid batch in the length direction of the first and the second timber boards.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VALINGE INNOVATION ABPRÄSTAVÄGEN 513 VIKEN SE-263 65

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bergelin, Marcus Lerberget, SE 45 4719
Brännström, Hans Höganäs, SE 12 646
Pålsson, Agne Hasslarp, SE 21 2835

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00