Rapid manufacturing process by using a focused ultrasound beam

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9975199
SERIAL NO

15028532

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention refers to a process for rapid manufacturing that uses a focused ultrasound beam according to the invention. The process is based on the local ultrasound welding of the material (2) grains that is under a powder form, welding that takes place solely in the focal spot of the focused ultrasound beam, the focal spot being scanned across the X-Y-Z directions within the powder (2) bed so as to 3D build the entire object (7) that is desired. The processes taking place in the focal spot region are local melting, local melting due to friction followed by filling of the gaps existing between grains, removal of the grain asperities, local inter-diffusion between neighboring grains as well as other phenomena that take place at the interfaces between materials when these are subjected to an ultrasound field.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INSTITUTUL NATIONAL DE CERCETARE-DEZVOLTARE PENTRU MICROTEHNOLOGIE - IMTBUCURESTI-VOLUNTARI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Moagar-Poladian, Gabriel Bucharest, RO 1 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00