Method of manufacturing semiconductor device, substrate processing apparatus and recording medium

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9974191
SERIAL NO

14805506

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Manufacturing quality of a semiconductor device can be improved, and manufacturing throughput can be improved. A method of manufacturing a semiconductor device includes (a) placing a substrate on a substrate supporting unit installed in a processing chamber, the substrate having thereon a solder with an oxygen-containing film on a surface thereof, (b) reducing the oxygen-containing film by supplying a reducing gas into the processing chamber while maintaining a thermal conductivity of an inner atmosphere of the processing chamber at a first thermal conductivity, and (c) melting the solder by supplying a thermally conductive gas into the processing chamber while maintaining the thermal conductivity of the inner atmosphere of the processing chamber at a second thermal conductivity higher than the first thermal conductivity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOKUSAI ELECTRIC CORPORATION3-4 KANDAKAJI-CHO CHIYODA-KU TOKYO 101-0045

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tsubota, Yasutoshi Toyama, JP 30 54

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00