System and method of supporting packet-switched handover

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9973977
SERIAL NO

14828164

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method of supporting packet-switched handover of a mobile station (MS) from a GERAN/UTRAN cell to a Generic Access Network (GAN) cell within a GAN. If the MS is within coverage of the GAN cell, the MS registers within the GAN, triggering initiation of the packet-switched handover from the GERAN/UTRAN cell to the GAN cell. A preparation phase is then conducted for executing the packet-switched handover. The preparation phase includes identifying the MS context as part of the preparation phase and activating the GA-PSR TC towards the MS. Next, the packet-switched handover is executed, resulting in the MS switching to GAN mode. The MS then begins transferring packets via the GAN cell. The system and method also supports a packet-switched handover from the GAN cell to the GERAN/UTRAN cell.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TELEFONAKTIEBOLAGET L M ERICSSON (PUBL)SE-164 83 STOCKHOLM SE-164 83

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Östrup, Peter Linköping, SE 24 208
Diachina, John Walter Garner, US 195 1230
Vikberg, Jari Järna, SE 288 6526

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00