Method and apparatus for clock frequency multiplier

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9973178
SERIAL NO

15434798

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a clock frequency doubler, an input clock feeds into a digital programmable delay circuit, and an inverted input clock feeds into another digital programmable delay. The outputs of these digital programmable delay circuits are combined with the input clock and inverse clock through AND gates in order to generate clock pulses at both the rising and falling edge of the clock. These signals are combined using an OR gate to provide an output clock signal with a frequency that is double the frequency of the input clock signal. The values of the control bits for the digital programmable delay circuit are determined in a time-to-digital conversion (TDC) circuit that includes a Successive Approximation Register (SAR). For every cycle of the clock, the SAR circuit successively sets the programmable delay control bits and compares the delay circuit output with the input clock to determine the value of the control bits.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NUVOTON TECHNOLOGY CORPORATIONNO 4 CREATION RD III HSINCHU SCIENCE PARK

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Holzmann, Peter J San Jose, US 13 159

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00