Energy harvester

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9973112
SERIAL NO

14437799

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An energy harvester includes a circuit for collecting an excess of electrical charges on a first connection terminal, wherein the circuit is equipped with a first controllable mechanical switch, and a control device for the first switch. There is a transducer suitable for directly transforming, without consuming the excess of electrical charges present on the first connection terminal, the variation of the energy to be harvested into a mechanical deformation which displaces the first switch from its open position to its closed position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE3 RUE MICHEL ANGE 75016 PARIS FRANCE
COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVESPARIS FRA PARIS PARIS
INSTITUT POLYTECHNIQUE DE GRENOBLE46 AVENUE FÉLIX VIALLET GRENOBLE 38000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cugat, Orphée Poisat, FR 7 17
Delamare, Jérome Grenoble, FR 4 14
Gimeno, Monge Leticia Grenoble, FR 2 6
Lebedev, Gor Grenoble, FR 9 33
Viala, Bernard Sassenage, FR 38 301
Zakharov, Dmitry Grenoble, FR 4 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00