System for power conversion with reactive power compensation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9973103
SERIAL NO

15408786

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power conversion system can be implemented to actively control a load while compensating for reactive power which may be sourced or consumed by an input filter circuit. In one aspect, the power conversion system can receive externally supplied multi-phase AC electric power, such as three-phase power from a power grid, and use a converter circuit to generate a DC bus. The power conversion system can then use an inverter circuit to generate multi-phase AC electric power from the DC bus for driving the load with adjustable frequencies and/or amplitudes as desired. The input filter circuit can be coupled to the converter circuit to filter out harmonics resulting from switching of the converter circuit. The power conversion system can receive feedback signals which may be used to determine reactive power sourced or consumed by the filter circuit, and can adjust the converter circuit to compensate for such reactive power.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROCKWELL AUTOMATION TECHNOLOGIES INC1 ALLEN-BRADLEY DRIVE MAYFIELD HEIGHTS OH 44124

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kerkman, Russel J Milwaukee, US 73 1683
Seibel, Brian J Grafton, US 35 454
Vadhavkar, Prathamesh R Grafton, US 4 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00