Linear generator and linear drive

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9973057
SERIAL NO

14762557

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Device for the reversible transfer of linear motion into rotational motion and for the conversion of rotational motion into electrical energy and vice versa. The device comprises a central rail and a support element which surrounds the central rail or is being surrounded by the central rail, the support element being positioned so as to be capable of performing a linear motion relative to the central rail in the longitudinal direction of the central rail. A number of rolling bodies which are in contact with the central rail are rotationally mounted in the support element. The rolling bodies rotate during the linear motion of the support element relative to the central rail in conjunction with the central rail. The linear motion is also connected to the drive or output of an electric machine. The elastically preloaded rolling bodies are arranged so that the central rail is essentially mounted with zero clearance under pressure, whereby the preload forces cancel each other out and are produced by elastically deformed retaining brackets on the support element. The rotations of at least one rolling body form the drive or output of the electric machine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SINN POWER GMBHGERMERINGERSTRASSE 9 GAUTING 82131

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sinn, Philipp Gauting, DE 4 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00