Asynchronous machine with optimized distribution of electrical losses between stator and rotor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9973050
SERIAL NO

14650431

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to an asynchronous machine (1) as can be used particularly in electric vehicles or hybrid vehicles. The asynchronous machine (1) has a rotor (5) and a stator (3). The asynchronous machine is designed and controlled in such a manner that it has a pole pair number p of p=3. Because of the reduced yoke saturation that can consequently be achieved, the stator yoke (9) can be designed with a lesser height hy1, such that a ratio of the outer rotor diameter D2a to the outer stator diameter D1a can assume values between 0.7 and 0.8. As a result, enlarged rotor teeth (19) and correspondingly enlarged rotor grooves (21) can be formed in the rotor (5), such that electrical losses in the material in the rotor grooves (21) acting as the rotor coil element (23) are smaller in comparison to conventional asynchronous machines. The electrical losses occurring to a greater extent in the stator (3) compensating for this lead to a lesser warming of the stator (3) than would be the case with the rotor (5) as the stator (3) can be cooled by simple means. Overall, a higher continuous torque can thus be achieved with the asynchronous machine (1) according to the invention.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROBERT BOSCH GMBHSTUTTGART GERMANY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Herranz, Gracia Mercedes Forchheim, DE 5 15
Heuser, Patrick Stuttgart, DE 6 18
Ruiz, De Larramendi Miguel Ludwigsburg, DE 3 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00