Change of current return path in a bipole power transmission system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9973004
SERIAL NO

15569906

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An arrangement for changing current return path in a bipole direct current power transmission system includes a converter station having an active and a passive converter connected in series between an active and a passive pole line via a first neutral bus, a metallic return transfer switch in an electrode line, a ground return transfer switch in a current redirecting path between the passive pole line and the neutral bus and a control unit which in case of change to the passive pole line for providing a return current path is configured to, upon control of power related to the active converter from steady-state to zero, close the ground return transfer switch and thereafter open the metallic return transfer switch, whereupon power related to the active converter may be controlled back to steady state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI ENERGY LTD8050 ZÜRICH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Avila, Hector-Armando Ludvika, SE 1 3
Björklund, Per-Erik Bjursås, SE 1 3
Holmgren, Tommy Ludvika, SE 12 91
Nyberg, Sören Ludvika, SE 2 9
Shearer, David Ludvika, SE 13 513
Sobrinho, Felipe Sao Paulo, BR 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00