Durable, heat-resistant multi-layer coatings and coated articles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9972583
SERIAL NO

13959601

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An article having a surface treated to provide a protective coating structure in accordance with the following method: vapor depositing a first layer on a substrate, wherein the first layer is a metal oxide adhesion layer selected from the group consisting of an oxide of a Group IIIA metal element, a Group IVB metal element, a Group VB metal element, and combinations thereof; vapor depositing a second layer upon the first layer, wherein the second layer includes a silicon-containing layer selected from the group consisting of silicon oxide, silicon nitride, and silicon oxynitride; and vapor depositing a third layer upon the second layer, wherein the third layer is a functional organic-comprising layer, wherein the functional organic-comprising layer is a SAM.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SPTS TECHNOLOGIES LIMITEDCOED RHEDYN RINGLAND WAY NEWPORT NP18 2TA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dangaria, Nikunj Milpitas, US 1 4
Grimes, Michael T San Jose, US 6 107
Kobrin, Boris Dublin, US 77 1968
Nowak, Romuald Cupertino, US 42 2397

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00