Transaction scheduling system for a wireless data communications network
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
May 15, 2018
Issued Date -
N/A
app pub date -
Dec 27, 2017
filing date -
Apr 1, 2015
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
System and method for scheduling and coordinating transmission signals in a wireless data communications network, comprising a master node and at least one tag node. In some embodiments, the network may also include a slave node. The master node divides time into repeating time division blocks comprising a configuration window and at least one transaction window. During the configuration window, the master node provides operating parameters to the tag or slave nodes, including a time slot within the transaction window that is reserved for the tag or slave nodes to broadcast data to the master node. The transaction window is subdivided into multiple reserved time slots, and each slot is assigned to a specific tag or slave node. When a reserved time slot arrives, the tag or slave node will broadcast data signals to the master node. The master periodically adjusts the transmission schedule for each tag or slave node, as needed, to ensure that every tag or slave node continues to broadcast only during its reserved time slot, thereby reducing communication data collisions and optimizing the overall performance and throughput of the data communications network.

First Claim
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
DDSPORTS INC | 7220 W FRONTAGE ROAD MERRIAM KS 66203 |
International Classification(s)
- H04M:TELEPHONIC COMMUNICATION
- H04L:TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAP....
- G08B:SIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; A....
- G08C:TRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL ....
- H04B:TRANSMISSION
- H04W:WIRELESS COMMUNICATION NETWORKS
- G06K:RECOGNITION OF DATA; PRESENTATION OF DATA; RECORD ....

- [Classification Symbol]
- [Patents Count]
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Bennett, Justin E | Newburgh, US | 11 | 156 |
Ciholas, Mike E | Evansville, US | 23 | 793 |
Hollinger, Herb A | Mount Vernon, US | 3 | 63 |
Ianni, Bruce C | Mission Hills, US | 14 | 215 |
Ross, Davyeon D | Overland Park, US | 13 | 211 |
Singer, Kyle D | Evansville, US | 2 | 46 |
Vanvorst, Dirk B | Evansville, US | 2 | 46 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Nov 15, 2025 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Nov 15, 2029 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events

Matter Detail

Renewals Detail

Note
The template below is formatted to ensure compatibility with our system.
Provide tags with | separated like (tags1|tags2).
Maximum length is 128 characters for Customer Application No
Mandatory Fields * - 'MatterType','AppType','Country','Title','SerialNo'.
Acceptable Date Format - 'MM/DD/YYYY'.
Acceptable Filing/App Types -
- Continuation/Divisional
- Original
- Paris Convention
- PCT National
- With Priority
- EP Validation
- Provisional Conversion
- Reissue
- Provisional
- Foreign Extension
Acceptable Status -
- Pending
- Abandoned
- Unfiled
- Expired
- Granted
Acceptable Matter Types -
- Patent
- Utility Model
- Supplemental Protection Certificate
- Design
- Inventor Certificate
- Plant
- Statutory Invention Reg
Advertisement
Advertisement
Advertisement

Recipient Email Address

Recipient Email Address

Comment
Recipient Email Address

Success
E-mail has been sent successfully.
Failure
Some error occured while sending email. Please check e-mail and try again!
PAIR load has been initiated
A preliminary load of cached data will be loaded soon. Current PAIR data will be loaded within twenty four hours.
File History PDF
Thank you for your purchase! The File Wrapper for Patent Number 9971916 will be available within the next 24 hours.
Add to Portfolio(s)
To add this patent to one, or more, of your portfolios, simply click the add button.
This Patent is in these Portfolios:
Add to additional portfolios:

Last Refreshed On:
Changes done successfully
Important Notes on Latency of Status data
Please note there is up to 60 days of latency in this Status indicator for certain status conditions. You can obtain up-to-date Status indicator readings by ordering PAIR for the file.
An application with the status "Published" (which means it is pending) may be recently abandoned, but not yet updated to reflect its abandoned status. However, an application filed less than one year ago is unlikely to be abandoned.
A patent with the status "Granted" may be recently expired, but not yet updated to reflect its expired status. However, it is highly unlikely a patent less than 3.5 years old would be expired.
An application with the status "Abandoned" is almost always current, but there is a small chance it was recently revived and the status not yet updated.
Important Note on Priority Date data
This priority date is an estimated earliest priority date and is purely an estimation. This date should not be taken as legal conclusion. No representations are made as to the accuracy of the date listed. Please consult a legal professional before relying on this date.
We are sorry but your current selection exceeds the maximum number of portfolios (0) for this membership level. Upgrade to our Level for up to -1 portfolios!.