Optical film, image display device, and method for producing image display device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9971064
SERIAL NO

13672187

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical film to be arranged on a display surface is adapted so as to allow uniform application of an interlayer filler and thus also is applicable to an image display device equipped with a front plate. Preferably, such optical film is for use in an image display device. The optical film is adapted so that a relationship of the following formula (1) is satisfied:

description='In-line Formulae' end='lead'b≤0.2a+1.8  (1),description='In-line Formulae' end='tail'

    where a is the viscosity (Pa·s) of an interlayer filler at the time of attaching the front plate to a surface of the optical film via the interlayer filler, and b is the atomic percentage (atm %) of silicon atoms on the surface of the optical film. The atomic percentage of oxygen atoms on the surface of the optical film is at least 26 atm %.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NITTO DENKO CORPORATION1-2 SHIMO-HOZUMI 1-CHOME IBARAKI-SHI OSAKA 567-8680

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hashimoto, Naoki Ibaraki, JP 135 1313
Takada, Katsunori Ibaraki, JP 80 597
Takemoto, Hiroyuki Ibaraki, JP 99 688

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00