Mold pump assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9970442
SERIAL NO

14112694

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A molten metal pump assembly (10) and method to fill complex molds with molten metal, such as aluminum. The pump assembly includes an elongated shaft (16) connecting a motor (14) to an impeller (22). The impeller is housed within a chamber (18) of a base member such that rotation of the impeller draws molten metal into the chamber at an inlet (48) and forces molten aluminum through an outlet (50). A first bearing (36) is adapted to support the rotation of the impeller at a first radial edge (32) and a second bearing (38) is adapted to support the rotation of the impeller at a second radial edge. A bypass gap (60) is interposed between the second bearing and the second radial edge. Molten metal leaks through the bypass gap at a predetermined rate to manipulate a flow rate and a head pressure of the molten metal such that precise control of the flow rate is achieved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PYROTEK INC9503 EAST MONTGOMERY AVENUE SPOKANE WA 99206

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tipton, Jon Aurora, US 17 470

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00