Right crank arm assembly for a bicycle and crank arm and front sprocket thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9969459
SERIAL NO

13907117

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A right crank arm assembly for a bicycle, comprises a right crank arm and at least one front sprocket coupled with the crank arm at at least one coupling portion of the crank arm. The front sprocket has an inner side adapted, in use, to face towards the frame of the bicycle and an outer side opposite the inner side. The assembly comprises at least one first crank arm element which acts in contact with the front sprocket on one of said sides and at least one second crank arm element which acts in contact with the front sprocket on the other of said sides. The contact action of the crank arm elements on the two opposite sides of the front sprocket prevents the twisting deformation of the front sprocket during pedaling. Such a deformation would cause a reduction in the transmission efficiency of the right crank arm assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CAMPAGNOLO S R LVALDAGNO VICENZA VICENZA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pasqua, Paolo Vicenza, IT 31 416
Valle, Maurizio Vicenza, IT 50 621

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00