Environmental-friendly mortar mixing robot

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9969103
APP PUB NO 20170341264A1
SERIAL NO

15534682

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An environmental-friendly mortar robot comprises a first, second, third, and fourth container module. The first container module (2) consists of a sand midway silo, a weighing system, a stirring system, and a control system; the second container module (3) consists of a cement silo, a spiral conveying machine, a material level meter and a water storage tank; the third container module (4) consists of a fly-ash silo, a spiral conveying machine, a material level meter and an air storage tank with an air compressor; the fourth container module (5) consists of a sand storage bin, an elevator, a material level meter and an additive storage box. While transporting, the first container module can be respectively detached into four functional modules which are directly put onto a transporting vehicle together with other three container modules for transportation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHENZHEN WEIHAI BUILDING MATERIAL CO LTDBUSHA ROAD BUJI STREET LONGGANG DISTRICT SHENZHEN GUANGDONG 518000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Zhengmao Guangdong, CN 8 10
Xia, Suping Guangdong, CN 1 1
Yang, Genhong Guangdong, CN 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00