Method for producing a turbine engine part, and resulting mould and intermediate blank

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9969035
SERIAL NO

15106124

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for producing multiple metal turbine engine parts, comprising steps consisting in:

    a) casting a metal alloy in a mold in order to produce a blank (3); andb) machining the blank in order to produce the parts,characterized in that the blank obtained by casting is a solid polyhedron having first and second sides (30a, 30b) and third and fourth sides (30c, 30d), in which the third and fourth sides extend between the first and second sides, flaring apart from the first side towards the second side, first at a first angle and subsequently at a second larger angle, and said at least one part is machined in the blank.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SNECMAPARIS FRANCE PARIS PARIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Deschandol, Karine Moissy-Cramayel, FR 4 1
Digard, Brou De Cuissart Sébastien Moissy-Cramayel, FR 11 10
Fargeas, Serge Moissy-Cramayel, FR 11 11
Huchin, Patrick Emilien Paul Emile Moissy-Cramayel, FR 12 36
Piaton, Valéry Moissy-Cramayel, FR 5 2
Soisson, Marc Moissy-Cramayel, FR 7 3
Texier, Anthony Moissy-Cramayel, FR 5 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00