Electric power conversion device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9966877
APP PUB NO 20170229979A1
SERIAL NO

15426553

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electric power conversion device includes: a first switching element; a second switching element; a control device; a first temperature sensor; a second temperature sensor; a first transmission circuit; and a second transmission circuit, wherein the control device has a storage device, and the control device is configured to: calculate a calculated temperature using a first signal and a correction amount; control the operations of the first switching element and the second switching element based on the calculated temperature; and add the difference between a first comparison temperature and the calculated temperature to the correction amount when the control device determines that a first comparison result changes from lower than the first comparison temperature to equal to or higher than the first comparison temperature, and that the calculated temperature is lower than the first comparison temperature.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHATOYOTA-SHI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yamamoto, Kazunari Miyoshi, JP 44 177

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00