Controller and controlling method of switching power supply

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9966831
SERIAL NO

14953793

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to a controller and a controlling method of a switching power supply. The controller of the switching power supply is used for turning on and off a power transistor so that inductor current flows through an inductor which is connected in series with the power transistor. The controller includes a frequency-jittering signal generating circuit, a superimpose circuit and a first comparator. The frequency-jittering signal generating circuit generates a frequency-jittering signal variable over time. The superimpose circuit superimposes the frequency-jittering signal on a sampling signal of the inductor current to generate a superimposed signal. The first comparator compares the superimposed signal with a control voltage to generate an OFF signal for turning off the power transistor. The controller of the switching power supply reduces conducted electromagnetic interference by a frequency-jittering control on the sampling signal of the inductor current.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SILERGY SEMICONDUCTOR TECHNOLOGY (HANGZHOU) LTDA1501 TECHNOLOGY MANSION NO 90 WENSAN ROAD HANGZHOU ZHEJIANG PROVINCE 310012

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bai, Yongjiang Hangzhou, CN 24 191
Hu, Zhiliang Hangzhou, CN 20 181
Huang, Qiukai Hangzhou, CN 55 344
Li, Le Hangzhou, CN 119 1818
Zhang, Dan Hangzhou, CN 280 889

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00