Outer-rotor permanent magnet brushless motor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9966804
SERIAL NO

14722723

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An outer-rotor permanent magnet brushless motor is disclosed, which comprises an outer-rotor and an inner-stator. The outer-rotor configured with P poles, P is a natural number and denotes a multiple of 4. The inner-stator has a stator axle, and S teeth which configured on outer surface of stator, S=P−1, S is a natural number. A circle is formed about a center of the stator axle from the center of the outer end surface. A correction angle a1 and an original angle a are defined from the center of the outer end surface. T The ratio of a1/a is defined by the following formula: 0.2<(a1/a)<0.6.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INDUSTRIAL TECHNOLOGY RESEARCH INSTITUTE195 SEC 4 CHUNG HSING RD CHUTUNG HSINCHU 310401

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Yu-Choung Jhudong Township, TW 29 363
Hsu, Chia-Hao Tainan, TW 116 726
Huang, Liang-Chiao Puxin Township, TW 2 4
Liu, Yang-Guang Xinfeng Township, TW 9 61
Yu, Shou-Long Taoyuan, TW 5 28

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00