Manufacturing method for non-aqueous secondary battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9966638
APP PUB NO 20160268648A1
SERIAL NO

15034739

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A manufacturing method for a non-aqueous secondary battery includes the following steps. (a) Preparing an electrode body including a positive electrode having a positive electrode active material layer and a negative electrode having a negative electrode active material layer. (b) Constructing a battery assembly using the electrode body and a non-aqueous electrolyte. (c) Initially charging the battery assembly. (d) Aging the battery assembly at a temperature of 60° C. or higher. (e) Forcibly starting to discharge the battery assembly in said temperature region after lowering the temperature of the battery assembly down to a temperature region of 35° C. or higher and 55° C. or lower. (f) Adjusting the SOC of the battery assembly. (g) Measuring a voltage drop amount by self-discharging the battery assembly. And (h) determining whether or not the battery assembly is qualified based on the voltage drop amount.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ohira, Junko Toyota, JP 19 57
Ueno, Yukiyoshi Toyota, JP 35 357

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00